|
|
Gippsland Lakes Discovery Trail (Mississippi Creek Trail) - Trail Description![]() Bridge over the Mississippi Creek. Alexander McCooke Location: East Gippsland, 310km from Melbourne Start/end: Colquhoun to Lakes Enterance Length open: 25.5km Surface: Gravel DescriptionRunning through the Colquhoun State Forest, the trail links the East Gippsland Rail Trail with Lakes Entrance. 7.5km of the trail follows the route of the Mississippi Creek Tramway used to transport stone from a local quarry for construction of the Entrance. The trail leaves the tramway at Scrivner Road, running beside the road to Lakes-Colquhoun Road which leads to Lakes Entrance. North of the quarry and beside Scrivner Road there are a few short steep sections. These sections of the trail are not suitable for touring or hybrid bikes. As of early 2008, some sections of this trail were damaged by heavy rain, though still passable, and are awaiting repair. Trail Map![]() ![]() Copyright © Railtrails Australia. For personal use only, do not reproduce. Our volunteers have spent many hours producing these maps. Please respect their work. GalleryClick any of the photos below for a larger image or display all. Related Information
Contributions and CorrectionsWe welcome contributions and corrections to our trail information. Please email Railtrails Australia accepts no responsibility for liability or loss or injury sustained in using the trails described on this site. Please show your supportIf you found this information useful, please consider showing your support by:
Railtrails Australia, Inc. is a not-for-profit organisation. |
|
|
Copyright © Railtrails Australia
|
Railtrails Australia - rail trails connecting communities
|
|