Trail Finder

Fill in one or more of the fields below to find matching rail trails.

km km

Become a financial member of Rail Trails Australia and help develop and support Australia's Rail Trails. Click below to Join or Renew.

Individual

Organisation

You can also make a

Donation

Guide Banner 4 2015

Tyers Junction Rail Trail - Trail Description

print

Trail

Tyers Junction Rail Trail

View larger map
Type: Tramway trail
Location: Gippsland, 30km north of Moe, 160km from Melbourne
Start/end: Collins Siding to Tyers Junction
Status: Open
Length open: 11km
Surface: Compacted earth
Terrain: Hilly
Best seasons: All, but can be muddy in winter
Public transport: Bus
Contact Region: Gippsland, Victoria
Riding the trail (2005)
Riding the trail (2005)
Suitable for walking Suitable for cycling mountain bikes Suitable for horse riding
legend

Details

Features

This trail is a favourite for enthusiasts who like mountain biking or walking in the bush. The trail passes through rainforest, fern gullies, messmate and stringybark forest, and there are plenty of birds, mammals and seasonal wildflowers. Expect fallen trees across the trail and watch out for snakes in summer.

Unfortunately this rail trail has been lacking attention from the managers recently and is quite overgrown in sections, and muddy in winter; one for the off-road enthusiasts.

Options

  • From Tyers Junction, explore the walking tracks along the eastern and western branches of the tramway.
  • The most interesting walk is along the Eastern Tyers River. These trails are less developed and are suitable for walking only. Ask at the Caringal Scout camp at Tyers Junction for further directions.
  • The Walhalla Goldfields Rail Trail is nearby.Petersons Lookout in Tyers Park has views of the Tyers Gorge and Latrobe Valley from a viewing platform and also picnic facilities.

Description

Access Points

  • Collins Siding: look out for Telbit Road on the left a few kilometres before Erica, also signposted to the Caringal Scout camp. The trail begins 20m north of Telbit Road just after the last house.
  • Telbit Crossing: look for the trail markers where the trail crosses Telbit Road.
  • Tyers Junction: the trail to Collins Siding starts near the Caringal Scout camp office, just above the main road.

Collins Siding – Tyers Junction(11km)

  •  From Collins Siding, follow the trail downhill through mountain ash forest towards Tyers Junction.
  • Where former railway bridges are missing, the trail goes in and out of creek beds.
  • The trail meanders through the forest, passing tree-ferns and common heath in bloom in late winter and spring
  • .Look and listen for lyrebirds, kookaburras and fan-tailed cuckoos, common in the area.
  • Swamp wallabies, brown antechinuses, koalas and echidnas may also be seen
  • The trail passes farmland to the east and before meeting Telbit Road After crossing Telbit Road, continue below the road for approximately 1km before coming back to the road.  Here the road has covered the railway formation for a short distance.
  • The trail resumes on the eastern side of the road.
  • Along the way, look for the remains of Christies bridge.The trail finishes at the edge of the scout camp.
  • Enjoy a picnic by the river before returning to Collins Siding either on Telbit Road or the trail.

For more information on this trail see the book Rail Trails of Victoria and South Australia.

Background Information

The Tyers Valley Tramway was a narrow gauge timber tramway built by the Forestry Commission of Victoria to exploit timber resources on the slopes of Mount Baw Baw, Victoria. The tramway met with the Victorian Railways narrow gauge line from Moe to Walhalla at Collins Siding, and was built to the same 2 ft 6 in (762 mm) gauge.  The tramways serving the Tyers Valley were largely destroyed by bushfires in 1926. Rather than rebuild the private tramways, the Forestry Commission, a government body, decided to construct a higher quality tramway to serve all the private sawmills in the district.

The tramway used secondhand 40 lb rails from Tasmania. It had a maximum grade of 1 in 30 (3.33%), and the curves a minimum radius of 80 ft (24.38 m). No ballast was used, however greater use was made of sleepers than was normal.

The tramway route extended 6.1 miles (9.8 km) from Collins Siding to Tyers Junction, where the line divided to follow the two branches of the Tyers River.

The tramway closed in 1949, and the Climax moved to the Government sawmill at Erica. The Climax was subsequently preserved on the Puffing Billy Railway, along with one of the TALC tractors.

Links

 

July 2013

To advertise your rail trail support business on this page, please click here.

Contact Us About This Trail

Email or click here: gippsland@railtrails.org.au.

Photos

Comments

Comments

2 comments

If you wish to write a comment on this trail, please log in or register a new account.


04 December , 2014 by cascho

I rode this trail on 3rd of December 3014, along with the Walhalla goldfields trail. This trail is only possible between Collins siding and Telbit Road - and only when its dry. Don't attempt during or after heavy rain. Along Telbit road the trail is too overgrown, almost impossible to find, and even with a bit of bush bashing, I had to turn back. To make it a loop, I road back along Telbit Rd. The best part is around Collins siding and just before Telbit road where you are essentially riding along fire access tracks.

03 April , 2013 by Thomo66

Hi we just spent Easter 2013 at The Scout Camp. Great spot pity that the Rail trail is very overgrown. We did want to link through to the MTB tracks from camp! After 2 ks and a lot of clearing we headed back on the road. Needs clearing to keep access!!

If you wish to write a comment on this trail, please log in or register a new account.

News

News

New 2011 Article by Trail Manager

(Posted: 16/04/11)

New article created by a Trail manager in Archive 2011.

More...

Objectives

(Posted: 07/12/10)

Vision

Our vision is to see a network of disused rail corridors being used for public purposes such as walking, cycling and horse riding trails.

Mission

 

To promote and support local Rail Trail groups to establish an Australia-wide network of paths and linear nature reserves along closed railway lines. To provide and document contacts, share information and act as a national resource centre.

Constitution

You can obtain a copy of the Rail Trails Australia Constitution by emailing admin@railtrails.org.au. To view or print this document you will need the free Adobe Acrobat Reader software.

More...

Linville Station Turns 100! (QLD)

(Posted: 24/10/10)

Celebrate the 100th birthday of the Linville Railway Station on 21 November.

More...

Curdies Trestle Bridge Official Opening (VIC)

(Posted: 24/10/10)

Following its completion in July this year the bridge will be officially opened.

More...

Daylesford to Woodend Trail is another step closer (VIC)

(Posted: 19/10/10)

Local group working closely with Council on walking and Cycling Strategy Report

More...

Railtrails Australia 2010 AGM

(Posted: 13/10/10)

The AGM will be held on Friday 12 November 2010 at 6:30 PM in North Carlton.

More...

New Summer Bus link From Colac to Beech Forest and Lavers Hill (VIC)

(Posted: 09/10/10)

From January to April 2011 a bus link will operate every Saturday, serving the Old Beechy Rail Trail

More...

Great Southern Rail Trail (Gippsland, Victoria) Heritage Day

(Posted: 03/01/07)

On Sunday 14th January 2007 the South Gippsland Tourist Railway is having a special day in conjunction with the Great Southern Rail Trail. More...