- Rail Trail
- On Road
- Temporarily Closed
- Potential Trail
- Other Trail
- Former Railway
The 26km Djerring Rail Trail is an interesting take on what you can do when you build an elevated railway line and cost is no object
- To see how much recreational space there can be when you elevate a railway line
- Lots of great parks and playgrounds along the way
- Regular railway stations along the way mean you can quit when you’re ready.
Nearby Attractions
- Oakleigh’s enclave of Greek restaurants
- Rosstown Rail Trail
- Outer Circle Rail Trail
- The best of Vietnamese food in Springvale
- EastLink Trail
- Dandenong Creek Trail.
Last updated: 1 August 2026
What started as a patchwork of lumpy, narrow paths beside the Pakenham-Cranbourne Line has been turned into a brilliant recreational facility for Melbourne’s densely packed south-eastern suburbs.
Due to incomplete infrastructure projects in Dandenong, the Djerring Trail is split in two:
- Caulfield to Dandenong (19.2km): A wide shared path that runs under the area’s “skyrail” development with some older, narrower sections where the railway is at ground level.
- Hallam to Narre Warren (6.9km): Dubbed the Hallam Valley Trail, this section is a railside trail running through parks and wetlands.
There are no emergency marker posts on this trail. In an emergency, call 000 and provide the name of the street nearest to you on the trail.
For public transport options scroll down to ‘GET AROUND’ and click on ‘SHOW MORE’ if necessary
Section Guides
Caulfield to Dandenong (19.2km)
- Access: The trail starts south-east of Caulfield Station near a park off Dudley St (Search: East Caulfield Reserve Toilet) where there’s a bike repair station, water fountain and picnic facilities but limited parking (past the cricket clubrooms). From the railway station, take Sir John Monash Drive to reach the reserve and trailhead
- The Rosstown Rail Trail can be ridden or walked from Murrumbeena Station while the Outer Circle one branches off to the left at Hughesdale
- It’s a straight run for more than 3km past play areas, picnic spots and dog parks until approaching Oakleigh, where the rails have returned to ground level. Here the trail uses the alignment of the Rosstown Railway branch line. Riders must take care on the approach to the station underpass, where the steps on the direct route are not well marked while the ramp for riders faces in the opposite direction. You must dismount anyway
- The route south from the underpass is also poorly marked and requires travelling through the station car park before the trail resumes at the far end. Not a safe spot during commuting periods
- It’s an older, narrower concrete path from here to Huntingdale and it then crosses the tracks before they head skywards again approaching Clayton
- At Springvale, the railway has been “trenched” but not the pedestrian crossing of busy Springvale Rd
- Sandown Park Station serves horse racing, greyhound racing and motor racing venues but has escaped rebuilding
- At Noble Park, more elevated train tracks have created a giant open space incorporating Ross Reserve, the large Noble Park Aquatic Centre, outdoor gym and skate park. Take your bathers
- At Yarraman Station, the Djerring Trail is joined briefly by the EastLink Fwy one, but then peters out on gravel in Greaves Reserve, home of the Dandenong Show
- You can make it to Dandenong Station via Attenborough St and a short section of Cheltenham Rd but it’s easier to catch the frequent Pakenham Line trains from Yarraman to Hallam for the start of the next section. It takes less than 15 minutes to get there.
Hallam to Narre Warren (6.9km)
- Access: From Hallam Station, the Hallam Valley Trail is less than 1km south via a shared path along the western side of Hallam Rd. If coming by car, the trail actually starts further west in a large park (Search: KM Reedy Reserve) where there are car spaces and toilets
- Head east along the trail, which borders the Hallam Main Drain and a large wetland
- It gets close to Narre Warren Station before a shared path along Shrives Rd, Centre Rd, Saxonwood Dr and Redwood Court will get you to what is called the Hallam Valley Trail Extension
- This will take you as far as Darling Way, where further work is needed for the railside trail to get to Berwick
- Head home by going back to Narre Warren Station.
CONNECTING PATHS
East Link Trail (35km): Meets up with the Djerring Trail at Yarraman, where it heads south beside the M3 and then on to Port Phillip Bay at Carrum. Heading north it uses the Dandenong Creek Trail for a while to give you a break from the freeway noise.
Dandenong Creek Trail (44km): This one provides a more pleasant way to get into Dandenong, but not to the railway station, and goes as far north as Kilsyth South.
Northern trailhead hidden away at back of East Caulfield Reserve [2025]
Plants have grown substantially since this photo was taken [2020]
Heading towards Oakleigh from Galbally Reserve on the Djerring Trail [2020]
Fittingly, trail has taken the place of redundant third track at Oakleigh [2026]
Old fashioned chicane heading south from Springvale [2026]
Elevated railway at Noble Park has opened up this area for leisure [2026]
The Hallam Valley Trail has limited trees due to floodwater channel [2026]
Public Transport
The Pakenham Line is served by the latest High Capacity Metro Trains, which run frequently as far as Pakenham in the east and Sunbury in the west via the Metro Tunnel. This tunnel connects you to numerous other suburban lines via its Town Hall and State Library stations, but there are several lifts to get up to the City Loop underground services.
Do you know of a bike hire or transportation service on this rail trail that should appear here? If so, let us know at admin@railtrails.org.au.
Information and Links
The Pakenham Line rail trail has been developed piecemeal, by local councils initially and then the Victorian State Government as part of it’s Big Build Program. Level-crossing removals were done at high-risk locations like Springvale Rd initially before the program was expanded to make the whole line “level-crossing free”. Most of the land on what’s now called the Djerring Trail was built is managed by the Department of Transport and Planning through VicTrack and Metro Trains, who use sub-contractors for trail gardening and maintenance. Email them here
Contact Rail Trails Australia
To contact us about this rail trail, email vic@railtrails.org.au
Background Information
Sections of the Pakenham Line opened in 1859, and it made it all the way there in 1877. The presence of private railway operators led to the opening of the Outer Circle Line (now a rail trail) and contributed to the push for the disastrous Rosstown Line before Victorian Railways bit the bullet, bought out the competition and rationalised the route into town. More stations opened progressively from 1879 to 2012, with urban sprawl leading to the opening of another station and huge train stabling and maintenance facility at East Pakenham in 2024. A $15 billion program of upgrades saw the line level-crossing free the following year and its High Capacity Metro Trains routed through the new Metro Tunnel to Sunbury to free up capacity in the existing City Loop tunnel. At Dandenong, the Level-Crossing Removal Authority is building a deeper railway underpass for trucks while an extension of the Dandenong Bypass to the South Gippsland Freeway and associated shared path to the Hallam Valley railside trail is on the backburner.
Djerring Councils Go For Gold
Posted: 12/06/26
With Victoria heading towards an election, the City of Greater Dandenong is pushing for state ...
More...Nearby Trails

Rosstown Rail Trail
Glen Eira, 9km south of Melbourne CBD
9 km







Ringwood to Belgrave Trail
Eastern suburbs, 40km from Melbourne CBD
17 km






Outer Circle Rail Trail
Eastern suburbs, 6km from Melbourne CBD
17 km







Hawthorn to Kew Rail Trail
Inner suburbs, 9km east of Melbourne CBD
1 km







Sandridge Rail Trail
Port Melbourne, 1km from Melbourne GPO
4 km







Inner Circle Rail Trail
Inner suburbs, 5km from Melbourne CBD
5 km







Webb Dock railside trail
Docklands, 1km south-west of Melbourne GPO
2.7 km







Eastern Dandenong Ranges Trail
Dandenongs, 50km south-east of Melbourne CBD
15 km



Mornington Rail Trail
Mornington Peninsula, 60km south of CBD
4 km







Warburton Rail Trail/Yarra Valley Trail
Yarra Valley, 50km east of Melbourne CBD
48 km







Meadowlink Linear Park
Broadmeadows, 20km north of Melbourne CBD
1.2 km



Red Hill Rail Trail
Mornington Peninsula, 90km south of Melbourne CBD
6.3 km





Powelltown Tramway Trails
Yarra Ranges, 80km east of Melbourne
39 km


Bellarine Rail Trail
Bellarine Peninsula, 75km south-west of Melbourne CBD
35 km






Rokeby to Neerim Railside Trail
West Gippsland, 100km east of Melbourne
17 km





Bass Coast Rail Trail
Bass Coast, 130km south-east of Melbourne
23 km







Noojee Trestle Bridge Rail Trail
West Gippsland, 100km east of Melbourne
3 km







Fyansford Rail Trail
Geelong, 5km north of town centre
4.4 km





Great Victorian Rail Trail
90km north of Melbourne
135 km







Woodend to Daylesford (incl Domino) Rail Trail
Goldfields region, 85km north-west of Melbourne
6 km





Great Southern Rail Trail
South Gippsland, 130km south-east of Melbourne
136 km







Tyers Junction Rail Trail
Baw Baw Ranges, 30km north of Moe
7 km




Grand Ridge Rail Trail
Strzelecki Ranges, 160km east of Melbourne
13 km





Moe – Yallourn Rail Trail
Latrobe Valley, 130km east of Melbourne
7.2 km





Erica to Thomson Rail Trail
Baw Baw Ranges, 165km east of Melbourne
7.3 km


Bunny Trail
110km west of Melbourne
7 km




One review of “Djerring Rail Trail”
72/100 Really starting to enjoy this trail, with its emerging connections to the Scotchmans Creek Trail, Waverley Rail Trail, Rosstown Rail Trail and Frankston Rail Trail already proving popular. Good to see the councils are trying to tidy up the loose ends